Mastodon Public Timeline Mirror of e5n.cc via Mastogr.am
终于找到了是哪个应用在偷跑我的 Cloudflare 流量了。
刚吃饭时,儿子跟我聊周处除三害,我突然意识到,很多人是从《周处除三害》的电影才知道周处的故事的。就像现在很多黑吗喽是从黑神话悟空了解西游记一样的。
刚喝酒回来,遇到一个山东兄弟,我喝酒比较佩服内蒙和山东的,我只能说,今天没有给湖北兄弟丢脸。
上一次(几年前)把 TAB 键统一格式为 4 个空格。这一次,把 TAB 从 4 个空格统一格式化成 2 个空格了。虽然我是非 IT 人士,平常几乎不写代码。
Mastodon Engineering<[email protected]>:
We are happy to announce the first beta release of Mastodon 4.3 🎉 11 months in the works, it is chock-full of improvements, the most prominent being notification grouping and new filtering capabilities, as well as extensive usability overhauls.

Please note that this is a beta, and the stable release is still to come. If you are upgrading your server to it, read the changelog carefully, and open GitHub issues if you encounter anything unexpected.

https://github.com/mastodon/mastodon/releases/tag/v4.3.0-beta.1

#mastoadmin #mastodev


https://mastodon.social/@MastodonEngineering/113012338363435978 Release v4.3.0-beta.1 · mastodon/mastodon
问的人不少,虽然我不用了,但更新了一下 Memos.top 的 API 兼容性,已支持老版(< v0.22.0) 和 新版(>= v0.22.0)两种 API。

这个是从非常早期的 Memos 版本一点点加代码加功能,变成现在这样一坨 💩 的。从现在版本重构,就算用 ChatGPT 也能精简 2/3 的代码,样式也不好看了(见异思迁)。终于也懂了网上说的屎山就是后期不断地加 if else 的。

https://github.com/eallion/memos.top/releases/tag/v0.22.4 Release v0.22.4 · eallion/memos.top
学名叫山胡椒,但是吃这个的地区都叫它木浆梓。mu jiang zi.
先不说什么什么,再说唐朝也没兴盛几年啊,大多数时候都是乱世,唐朝是中国历史上死人比例最高的朝代,接近 80% 的人死于动乱。(比例最高,人数不是最多)
多来点这种,喜欢看。
#TIL 发布什么教程或者开源项目,千万不要硬编码,有人 Fork 了我的东西部署后,现在每天稳定 7W 请求,而这个接口早就下线了。
这几天清理了一波云服务,把用不上的都清理掉了,省得什么时��悄悄扣费。
最近到处看到有个给 PDF 加盖骑缝章的工具,就感觉很怪异。
#TIL 原来 JS 标准内置对象早已支持相对时间显示了 Intl.RelativeTimeFormat 还有其他一些如货币符号本地化。 https://developer.mozilla.org/en-US/docs/Web/JavaScript/Reference/Global_Objects/Intl/RelativeTimeFormat
Google 也搞这种风格的翻译。
Back to Top